Volvo

Location: Belgium – Gent
Year of execution: 2011

The robotics installations of this Volvo division in Ghent were disturbed by dust formation on the receptors. After laboratory research it turned out that a large part of this dust came from the soft covered outside floor. To provide a solution to this, it was decided to harden and grind the entire floor in order to find an ideal combination between sufficient anti-slip and polished surface to limit dust formation.